Work's set to begin for long-awaited road work in Wawa.
The Municipality of Wawa says the so-called "Connecting Link" project is set to begin Wednesday, reconstructing Mission Road from Chris Simon Drive, down Main Street to Gladstone.
J. Provost Contracting will be doing the work, which includes repaving and resurfacing, making Mission Road into two lanes of opposing traffic with a middle turning lane and bicycle lanes on each side, replacing curbs and gutters, and adding new pedestrian crosswalks.
Residents are warned work will take place between 7 am and 8 pm and may result in slower traffic speeds and delays, as well as noise, dust, and building vibrations.